GET A QUOTE

Wombarra Rockfall Barrier, Sydney Trains

South East Coast of NSW   ·   2016

Project Details

In 2016, Ground Stabilisation Systems assisted Sydney Trains via rockfall analysis and fencing to protect rails near Wombarra.

This particular rail cutting was deemed to be a constant problem site. It consisted of two benched slopes – the upper bench at 8m high and the lower bench at around 7m high consisting of isolated boulders.

A rockfall analysis was conducted to ensure the correct positioning of the fence and determining bounce heights throughout the cutting. At the time when GSS installed the 100kj fence, it was the first of its kind produced by Macceferri “™” to be installed in Australia.

GSS has continued to develop safe and reliable systems to ensure the continuity of installing such barriers.

Contact our team today to learn more about our rockfall analysis and protection services.

Previous
Next
 groundstabilisationsystems
START YOUR PROJECT TODAY