South East Coast of NSW

Wombarra Rockfall Barrier, Sydney Trains

Project Details

Download Case Study Here

IN 2016, GROUND STABILISATION SYSTEMS ASSISTED SYDNEY TRAINS VIA ROCKFALL ANALYSIS AND FENCING TO INSTALL RAIL CORRIDOR PROTECTION NEAR WOMBARRA.

This particular rail cutting was deemed to be a constant problem site. It consisted of two benched slopes – the upper bench at 8m high and the lower bench at around 7m high consisting of isolated boulders.

rockfall analysis was conducted to ensure the correct positioning of the fence and determining bounce heights throughout the cutting. At the time when GSS installed the 100kj fence, it was the first of its kind produced by Macceferri “™” to be installed in Australia.

GSS has continued to develop safe and reliable systems to ensure the continuity of installing such barriers.

CONTACT OUR TEAM TODAY TO LEARN MORE ABOUT OUR ROCKFALL ANALYSIS AND PROTECTION SERVICES.

Send us an enquiry

"*" indicates required fields

Request our Company Profile

Please fill out the form below to request our company profile. One of our team will send through our profile shortly.

"*" indicates required fields