Otford, Sydney Trains

Sydney   ·   2018

Project Details

In 2018, Ground Stabilisation Systems assisted Sydney Trains to install rockfall netting and ground anchors to protect the rails.

The Otford rail cutting is 150m long and an average 18m high. The Sydney Trains design was a culmination of 5,000sqm of rockfall netting, 5000sqm of Enkamat and 115 anchors to be installed throughout the cutting.

GSS carried out these works during the designated rail shutdown periods, which was a total of 8 days.

For more information about our railway protection services, get in touch with our professional team today.