GET A QUOTE

Coffs Harbour City Council

Coffs Harbour   ·   Mar 2015 - Oct 2015

Project Details

The steep hills and fertile soils of the Coffs Harbour area are not only spectacular, but when combined with the heavy annual coastal rainfall provide special engineering challenges in many areas.

GSS has worked closely with Coffs Harbour City Council on several North coast landslip sites and has been required to employ varying techniques and specialized materials and equipment to solve the challenges created by the terrain.

Pinned drapery, one of the complex specialist techniques employed included the use of Glass Fibre Reinforced plastic (GFRP) soil nails, rock anchors, a turf reinforcement mat (TRM) and 3mm double twist high tensile steel collapsible mesh.

A shotcrete retaining wall was also completed on the low side of the road to ensure stability and allow widening of the road.

Previous
Next
 groundstabilisationsystems
This error message is only visible to WordPress admins

Error: The account for groundstabilisationsystems needs to be reconnected.
Due to recent Instagram platform changes this Instagram account needs to be reconnected in order to continue updating. Reconnect on plugin Settings page

START YOUR PROJECT TODAY